Euromir 95 Ground Segment Design And Implementation

£5.00

W. Salter, P. Dau. (1997), JBIS, 50, pp.367-370

Refcode: 1997.50.367

Abstract:

Anite Systems supported DLR in the design. implementation and testing of the GNI for the EM95 mission. Furthermore, during the course of the 6 months of mission operations support was provided to the preparation and execution of a total of 18 Public Relation (PR) events which were conducted to raise the public awareness of manned space flight, and of this mission in particular.